Engineering Consultancy services for strengthening and widening of existing 2-lane road to 4-lane dual carriageway from Tindivanam (km 121) to Ulundurpet (km 192.25) on NH-45, Tamil Nadu (71 KM)

Project Description

  • The Tindivanam -Tiruchi section of NH45 is a part of this scheme. The Project Road has been divided into three packages Package-I, Km 122 – km 192.25, Tindivanam – Ulundurpet, project stretch there are 6 major bridges, 12 minor bridges and 109 culverts. Major bridges width varies from 5 -21m, and of minor bridges varies from 3-8 m for major bridges varies.
  • The road in section I km.122 – 193, crosses railway lines at km.156/0, on the proposed Villupuram bypass (the level crossing at km 158/600) and at km.165/2. The existing overbridge at km.156/0 will be supplemented by additional two lane over bridge. Four lane over bridges are proposed at the remaining two locations. Toll Plaza has been proposed at (km 149/200), will have 6-lanes. The stretch also contains three major junctions.